Cultural heritage · 2021

Trans-Iranian Railway

Iran

A country crossed by a single track

A railway line runs through Iran from top to bottom, from the Caspian Sea to the Persian Gulf, crossing two mountain ranges with spiral tunnels and stone bridges. The Trans-Iranian Railway is 1,394 km long and was opened in full in 1938. It is worth coming to know at least once in a lifetime because it shows, with the concrete force of a work still in service, how a country decided to build its own modernity by itself: the railway was financed from national resources, without foreign capital and without the control that would have accompanied it. It is a busy main line, not a motionless monument. The Trans-Iranian Railway has been inscribed on the World Heritage List since 2021 as number 1585, under two cultural criteria. The railway expertise brought from abroad gave rise to an architectural style that mixes Iranian and Western elements (criterion ii). The line is also an outstanding example of technological and architectural development in western Asia, which changed the social, economic and cultural life of the country (criterion iv). This page gives no travel advice and refers to the official sources for the current situation.

The site

Iran. Cultural · Inscribed on the UNESCO World Heritage List in 2021.

Criteria for inscription

  • (ii) Exchange of ideas and techniques that influenced architecture, the arts, town planning or landscape
  • (iv) An outstanding example of architecture, technology or landscape illustrating a significant stage in history
Number on the List
1585

What UNESCO protects

The inscribed property is not a building and not even a landscape in the strict sense: it is a line, a ribbon of steel 1,394 kilometres long that links the Caspian Sea, in the north, to the Persian Gulf, in the south-west. According to the UNESCO text, the railway crosses two mountain ranges, but also rivers, plateaus, forests and plains, and touches four different climatic zones.

What is protected are the route, the engineering works that make it possible and the architectural features of the stations and service buildings. The inscription dates from 2021.

Criterion (ii)

Along the railway an exchange of ideas, techniques and knowledge between different countries can be seen, which left its mark on architecture, town planning and landscape (criterion ii).

The railway skills arrived from outside, brought by companies and technicians from many nations, and merged with local knowledge. The result was a style that blends Iranian and Western elements, visible in the works and buildings along the line. The UNESCO text speaks of a successful collaboration between the Iranian government and 43 construction companies from different countries.

Criterion (iv)

Here the important milestone is the arrival of the railway in western Asia, with construction and technology of exceptional value (criterion iv).

According to the UNESCO justification, the line is remarkable for its scale and for the engineering works needed to overcome steep gradients and other difficulties. Its construction transformed the social, economic and cultural life of the country. A popular source calls it a “living museum”, because trains continue to run on it.

Where it is

The property lies in Iran and has an unusual shape for a World Heritage site: it stretches from one sea to the other. In the north the line reaches the Caspian, at a place now called Bandar Torkaman, formerly Bandar Shah. In the south it descends to the Persian Gulf, at Bandar-e Emam Khomeyni, formerly Bandar Shahpur.

Tehran, the capital, is the central node of the route. An encyclopedic source recalls that the line also passes through Ahvaz and Qom.

How large it is

The dimension that matters, for a property like this, is the length: 1,394 kilometres, according to the UNESCO text, while an Italian company that worked on it speaks of about 1,400 kilometres. The figure is therefore stable, and is enough to give the idea of a work that crosses an entire country.

The area of the property and of the buffer zone, and the extent of the protective bands, should be read in the official UNESCO text: for a line so long and narrow, the length says more than the area.

Why a railway across Iran

The first route proposals were put forward in 1925, shortly after the rise to power of Reza Shah, and work began in 1927, two years later. Iran was setting out later than other countries, and this allowed it to profit from the lessons of others.

The route is linked, even in idea, to older routes, such as the Silk Road and the Spice Route, and its construction, like its operation, encouraged trade and cultural exchange. The work is regarded as a symbol of the development of the State in the twentieth century: joining the Caspian and the Gulf meant giving the country a backbone of iron.

The dreams before the war

The idea was older than 1925. According to one reconstruction, Russian promoters had proposed a link between Russia and British India in 1889, 1900 and 1905, but met resistance from their own government.

In 1910 a group of Russian banks was reported to have been formed, joined by French banks in 1911, and in 1912 a study company was founded with British financiers as well. British reluctance and the Balkan wars slowed everything down. Surveys on the stretch between Enzeli and Tehran began by June 1914, but shortly after the outbreak of the Great War Russia repudiated its commitments.

A gauge designed for Europe

Among the most farsighted choices was that of standard gauge, 1,435 millimetres, adopted so that the line could one day be linked to European networks. Another novelty was the use of photogrammetric surveys from the air.

The choice had consequences that reach to the present: when, in 2014, the rail link between Gorgan and Etrek, in Turkmenistan, was opened, the Russian-type network, with a gauge of 1,520 millimetres, required special services at the border. A difference of just 85 millimetres is enough to complicate the passage from one network to the other.

Spiral tunnels and bridges

The route crosses two mountain ranges with prolonged gradients that remain below 3 per cent, the practical maximum for mountain railways. An encyclopedic source gives maximum gradients of one in 36.

To overcome the difference in height, according to the UNESCO text and related sources, 174 large bridges, 186 small bridges, 224 tunnels, 11 of them spiral, and 89 stations were needed, largely still today as in the 1930s. The spirals are the most characteristic feature of the line: at points where the difference in height is too great for a direct route, the tracks wind inside the mountain and gain altitude without increasing the gradient.

The challenges of the rock

The construction site crossed malarial marshes, deep valleys, plateaus, deserts and plains, and everywhere it found a different obstacle. Some tunnels were abandoned when deposits of salt and gypsum were discovered, and the route had to be changed, a sign of how little the subsoil was known before digging. Another, dug in volcanic pumice rock, could not be opened with normal methods.

According to one reconstruction, the scarcity of water also complicated the preparation of concrete and mortar.

The Veresk Bridge

Among the most famous works is the Veresk Bridge, in the Elburz mountains, recalled in the book edited by UNESCO as an example of the bridges needed to cross the mountain range. The volume speaks of 360 bridges in all and of 224 tunnels, including 11 spiral ones.

In the account of an Italian company that built sections of the north, a bridge crossed a narrow valley joining the tunnels of two mountains, with the arch 70 metres above the river. It illustrates well the spirit of the line: works built where nature seemed to leave no room.

Who built it

A work like this could not be done by a single company. According to one reconstruction, in 1924 a United States company agreed a feasibility study with Reza Khan. From 1927 an international group, made up of the same company and three German firms, built two trial sections, but the Americans closed the contract in 1930 over delays in payments.

In April 1933 Iran entrusted the works to a Danish company, Kampsax, which divided them among many firms. There is talk of 43 lots and, according to the UNESCO text, of 43 companies from many countries, with more than 65,000 workers in all. Again according to this reconstruction, Kampsax finished under budget and ahead of schedule.

The Italian construction site

One of the companies was the Italian Impresit, now merged into Webuild. It took five of the most difficult lots: four in the north and one in the province of Khuzestan, in the south. Among its works is remembered an access ramp to a tunnel under the Gaduk Pass, on a stretch that climbs about 1,200 metres in less than 50 kilometres.

In total, for the Impresit lots, there are about 50 kilometres of railway, 73 tunnels and about 2,000 metres of bridges and viaducts. These are small numbers compared with the whole line, but concentrated where the mountain was hardest.

Snow in the north, heat in the south

The Webuild account describes conditions at opposite extremes. In the northern lots improvised cable cars carried the sand needed for the cement, and in winter up to two metres of snow fell: a construction site where every material went up by makeshift means.

In the southern lot, in Khuzestan, the heat was such that work was done at night. For that stretch about twelve engineers, twenty officials, eighty technicians and 12,000 local workers were needed, for 26 months without interruption.

Taxes, tea and sugar

The work was financed in part by national taxes, for example on tea and sugar. Unlike many railway projects of the period, it was financed by national taxation precisely to avoid foreign investment and control.

An encyclopedic source indicates that Iranian expenditure in 1938-39 was 2,195,180,700 rials and recalls that some critics maintained that roads would have been a better investment, and that the line did little to lower transport costs. The value recognised by UNESCO, however, concerns the work and its historical significance.

The war and the Persian Corridor

In August 1941 Soviet, British and British Indian forces entered Iran: the Allies wanted to secure oil and a supply route to the Soviet Union, the so-called Persian Corridor. The railway, just completed, became a wartime line.

From September 1941 British engineers ran the southern division, from Tehran to Bandar Shahpur, and the Soviets the northern one, as far as Bandar Shah. Freight traffic rose from one train a day to 978 tonnes a day in the early months of 1942, and up to 5,400 tonnes a day in September 1943. In December 1942 the United States Army took over the southern section.

After the war

The aid traffic to the Soviet Union ended in May 1945. In June the British returned the line to the Iranian State Railways. In 1944 the average load was 6,489 tonnes a day, after the arrival of diesel-electric locomotives and thousands of freight wagons from the United States.

In the following years the network grew around the original route: according to an encyclopedic source it was extended to Gorgan in 1961 and, during the White Revolution, in 1963, to Mashhad, Tabriz and Isfahan. The UNESCO inscription, however, concerns the original route of 1938, not the entire network that has developed today.

Integrity and authenticity

The line includes everything needed to express its value: the route, the engineering works and the architectural features. The material conditions are largely good, and the technical function and social use have been maintained.

Location, form, design, materials and function are largely preserved, even though some elements have been improved or replaced and some sections extended or modified. It is a living structure, protected also by rules on buffer bands and on technical, visual and functional requirements.

How it is protected

The railway is entered in the national list of heritage monuments, with the highest level of protection in the country, and 22 buildings and structures are also protected individually. Protection rests on provisions of the Constitution, on the law for environmental conservation and on criminal provisions against the destruction of natural heritage.

It is looked after by a dedicated office, the Trans-Iranian Railway Office, part of the Iranian railway company. A steering committee, with a representative of the Ministry of Cultural Heritage, Tourism and Handicrafts, discusses conservation matters, and a technical committee takes the decisions. A long-term general plan covers the technical, operational, financial and safety aspects.

The threats

Since the railway is in service, the risks come from its use more than from abandonment: the pressure of development in urban areas, and the drive to modernise and increase efficiency, which must be kept under careful control, because the value of the property lies precisely in the historic appearance of its works.

Tasks also remain to be carried out: documenting and conserving buildings no longer in use and completing detailed inventories of the cultural elements, with the same level of detail as those on engineering.

Figures that do not add up

Figures vary from one source to another. The bridges are 174 large and 186 small according to the UNESCO text and Webuild, 360 according to the book edited by UNESCO, and about 4,100 according to an encyclopaedic source, which also gives about 230 tunnels against the 224 of the other texts.

The contractors were “43 lots” in one case and “43 firms” in another. For the termini, one account gives the Caspian to the north-east, another simply to the north. The length is 1,394 kilometres according to one source and about 1,400 according to a firm that worked on it. The eleven years, from 1927 to 1938, are instead a count that matches.

Before departure

They give no opening hours, prices or visiting rules and refer to the official website. Nor do they give the area of the property or the extent of the buffer bands: these data should be read in the official UNESCO text, together with the decisions of the World Heritage Committee.

Also left without a precise answer are the highest point of the line, which an encyclopedic source places near Arak at 2,220 metres, and the exact number of historic stations that have remained intact.

In brief

Cultural site number 1585, inscribed on 25 July 2021 under criteria (ii) and (iv). A line of 1,394 kilometres from the Caspian to the Persian Gulf, built from 1927 to 1938 with the contribution of 43 companies from many countries.

The numbers to remember: 174 large bridges, 186 small ones, 224 tunnels of which 11 spiral, 89 stations, 22 individually protected buildings. Financed with national taxes, used as an artery of Allied aid during the war, the railway is still in service, under the pressure of urban development and modernisation.

Before departure

For a trip to Iran, consult the country page on Viaggiare Sicuri, the Farnesina’s service, for up-to-date advisories. For visiting conditions, it is advisable to contact the local authorities and the official UNESCO website.

The railway is a working line and not a museum with regulated entrances: all practical information should be sought from the official source, before organising any travel. The official UNESCO website devotes a page of its own to the property, with the description and the decisions of the Committee.

Key dates

  1. 1925First route proposals under Reza Shah
  2. 1927Work begins
  3. 1933Iran entrusts the works to a Danish company, which divides them into lots
  4. 1938Full opening of the line
  5. 1941During the Second World War the line becomes the axis of the Persian Corridor
  6. 2021Inscription on the UNESCO List (25 July)